Pass4itsure > Microsoft > Role-based > MB-320 > MB-320 Online Practice Questions and Answers

MB-320 Online Practice Questions and Answers

Questions 4

You are responsible for product and formula maintenance for a paint manufacturer.

You create a formula for white paint and add its lines. When the formula size increases or an ingredient changes, the quantity of the pigment ingredient must be adjusted proportionately.

You need to set up the formula line for the pigment.

Which formula feature should you use?

A. Pegged supply

B. Step consumption

C. Scalable

D. Variable

Buy Now
Questions 5

Note: This question is part of series of questions that present the same scenario. Each question in the series contains a unique solution that might meet the stated goals. Some question sets might have more than one correct solution, while

others might not have a correct solution.

After you answer a question in this section, you will NOT be able to return to it. As a result, these questions will not appear in the review screen.

A company produces and distributes seafood to supermarkets. During the manufacturing process, raw seafood is purchased, cleaned, and packaged into various-sized boxes. Each box may have a different weight.

Product is sold by the box and priced by the pound.

You need to ensure that you can perform transactions at the box level and record the net weight of goods shipped to a customer.

Solution: Set up the product as a catch weight item with batch control. Set the catch weight unit to box and the inventory unit to pounds.

Does the solution meet the goal?

A. Yes

B. No

Buy Now
Questions 6

A company has a Dynamics 365 Supply Chain Management implementation. The company plans a promotional sales campaign that targets top customers.

The sales campaign will guarantee that orders are delivered within a specific two-week period.

The system configuration must prioritize a group of similar production orders so they can be scheduled at the same time.

You need to configure the system.

What should you create?

A. Production pool

B. Production group

C. Production flow model

D. Production unit

Buy Now
Questions 7

You need to enable the features and configuration keys for the firepits.

Which two features should you enable? Each answer presents part of the solution.

NOTE: Each correct selection is worth one point

A. Engineering attributes

B. Change management for process manufacturing

C. Engineering product variants

D. Engineering change management

E. Production floor execution management

Buy Now
Questions 8

You need to set up the correct production solution for the assembly area.

Which solution should you implement?

Case Study Title (Case Study):General information

A manufacturing company produces custom configured-to-order motorcycles. The company plans to implement Dynamics 365 Supply Chain Management. The company contains one legal entity located in Missouri where all production and warehousing operations occur.

Customization options

The custom motorcycles have a variety of selections that can be selected in the listed order by the end customer, including the following:

Customization restrictions

The following restrictions on customizations are in place:

*

Green color can only be sold with the Legend Trim.

*

Orange color can be sold with the Sport or Legend Trim.

*

The ML seat must be included in the Legend package.

*

The MS seat must be included in the Sport package.

Manufacturing facilities

The company includes the following manufacturing groups: Assembly and Plastic Molding. The Assembly group is responsible for assembling the motorcycles with purchased and manufactured goods. The Plastic Molding group is responsible for manufacture of all plastic parts used in the assembly area.

Motorcycle manufacturing

The parts for the product assembly are picked from the warehouse and staged at the correct workstation by a warehouse operator for each production order.

Plastic manufacturing

Plastic parts are molded using dyes that create multiple parts at once. The parts are machined in the same production process to remove excess plastic and add additional holes for assembly. Excess plastic is recycled back into the feedstock of the same color plastic chips for use in the molding process.

Metal Parts

Raw metal parts are purchased fully machined but without primer or paint. The parts are subcontracted to a vendor for primer and paint based upon the color requirements.

Facility

The company has a single warehouse that supports both the assembly and plastic manufacturing areas. The warehouse consists of three aisles with 15 bins and three shelves. The facility has no Wi-Fi capacity but has hardwired terminal

stations throughout the assembly production line.

Transactions are currently completed by office staff. Raw materials transfer must support capacity constraints for paint and primer.

Requirements

The company has a single warehouse that supports both the assembly and plastic manufacturing areas. The warehouse consists of three aisles with 15 bins and three shelves. The facility has no Wi-Fi capacity but has hardwired terminal

stations throughout the assembly production line.

Transactions are currently completed by office staff. Raw materials transfer must support capacity constraints for paint and primer.

Sales Order

The company has the following requirements for sales orders:

*

During the configuration of a sales order, invalid combinations must be prevented.

*

Each configuration must create a unique bill of material (BOM) and Route based on options selected.

*

Sales pricing for the sales order must be based upon options selected.

*

Due to emissions regulations, the motorcycles cannot be sold to the state of California.

Motorcycle manufacturing

The company has the following requirements for motorcycle manufacturing:

*

Schedule labor only at the labor pool level without machines by day

*

Produce motorcycles within a scheduled day in any order.

*

Record actual production labor with start/stop times.

*

Record manager approval of labor entered prior to posting.

*

Post actual material consumption after production is finished.

Plastic manufacture

The company has the following requirements for motorcycle manufacturing:

*

Schedule both labor and machines.

*

Adjust schedules by using a Gantt chart.

*

Backflush standard labor by operation.

*

Post actual material consumption at the start of production.

*

Track and allocate costs to the excess plastic.

*

Report multiple molded part numbers during the same production run.

*

Determine the correct mold to use on a production order.

*

Generate a batch number for each production order.

Metal Parts

The company has the following requirements for metal parts manufacturing:

*

Schedule shipments to the vendor for painting.

*

Receive painted parts into inventory from the vendor.

*

Track vendor inventory levels.

Default You must configure defaults for manufacturing execution production orders to meet the followingrequirements:

*

Ensure accuracy for production order pick list posting.

*

Ensure correct pick list creation.

Issues

A. In the current system, the company cannot calculate overhead rates and determine the breakdown of material, labor, machine, and overhead costs for production.

B. The company is manually calculating an 8% overhead on materials and posting a journal manually.

A. Standard warehousing with Manufacturing execution

B. Standard warehousing for all transactions

C. Advanced warehousing for all transactions

D. Advanced warehousing with Manufacturing execution

Buy Now
Questions 9

HOTSPOT

You need to configure each item for plastic manufacturing.

Which production types should you use? To answer, select the appropriate option in the answer area.

NOTE: Each correct selection is worth one point.

Hot Area:

Buy Now
Questions 10

A company manufactures automobile engines.

You must create product configurations for values that are used in different types of engines. Each value is based on a master valve design. Different gaskets and fittings are used to allow valves to work with different engines.

You need to translate production plans into Dynamics 365 Finance and Operations elements.

Which four actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

Select and Place:

Buy Now
Questions 11

HOTSPOT

A company implements Dynamics 365 for Finance and Operations.

You run a master plan each week.

You need to resolve the issue in the scenario.

What should you do? To answer, select the appropriate option in the answer area.

NOTE: Each correct selection is worth one point.

Hot Area:

Buy Now
Questions 12

HOTSPOT

You need to configure the requirements for metal fabrication equipment maintenance. What must you configure? To answer, select the appropriate options in the answer area.

NOTE: Each correct selection is worth one point.

Hot Area:

Buy Now
Questions 13

HOTSPOT

You need to create the new limited-edition bicycle for the summer season in Dynamics 365.

What should you use? To answer, select the appropriate options in the answer area.

NOTE: Each correct selection is worth one point.

Hot Area:

Buy Now
Exam Code: MB-320
Exam Name: Microsoft Dynamics 365 Supply Chain Management, Manufacturing
Last Update: Aug 27, 2023
Questions: 230
10%OFF Coupon Code: SAVE10

PDF (Q&A)

$45.99

VCE

$49.99

PDF + VCE

$59.99