If the production is for higher volume and monitoring and the Mean and variability is to be monitored for four machines producing product and the characteristic to be monitored is Variable Data, which SPC Chart is best to be selected?
A. Xbar-R Chart
B. Individual-MR Chart
C. NP Chart
D. CUSUM Chart
Which statement(s) are correct about the Pareto Chart shown here for the DOE analysis? (Note: There are 2 correct answers).

A. It is unknown from this graph how many factors were in the Experimental Design
B. The factors to keep in the mathematical model are E, D, DE, BD and B with an alpha risk equal to 2.06
C. The effects to keep in the mathematical model are E, D, DE, BD and B with an alpha risk equal to 0.05
D. The factors to keep in the mathematical model with a 5% alpha risk are BE, AB, A and AD
Measurement __________ is defined as the difference between the observed and the expected values for a given set of data.
A. Breadth
B. Linearity
C. Range
D. Bias
Which statement(s) are incorrect about Fractional Factorial Designs?
A. A Half Fractional Design for 5 factors has the same number of experimental runs as a Full Factorial Design for 4 factors assuming no repeats or replicates or Center Points
B. Quarter Fractional experiments can exist for those with 4 factors
C. Resolution V design is desired while controlling costs of experimentation
D. Half Fractional experiments do not exist for those designs with only 2 factors
The English words used for the 5S's are Sorting, Straightening, _____________ , __________ and Sustaining. (Note: There are 2 correct answers).
A. Shaping
B. Shining
C. Standardizing
D. Signing
An ANOVA used across many dependent variables could increase the Beta risk.
A. True
B. False
The English words used for the 5S's are __________ , _____________ , Shining, Standardizing and Sustaining. (Note: There are 2 correct answers).
A. Shaping
B. Sorting
C. Shifting
D. Straightening
Common and ______________ Cause Variation are the focus of Statistical Process Control.
A. Uncommon
B. Ordinary
C. Special
D. Selective
Modern quality management recognizes the importance of all the following except:
A. Customer satisfaction
B. Inspection over prevention
C. Continuous improvement
D. Management responsibility
Who are stakeholders?
A. People who are positively or negatively affected by the project
B. People who are positively affected by the project
C. People who are negatively affected by the project
D. People who neither take active part in the project nor have no interest in the project