Pass4itsure > HP > HP Certifications > HPE6-A66 > HPE6-A66 Online Practice Questions and Answers

HPE6-A66 Online Practice Questions and Answers

Questions 4

Which must you perform in IRIS to assign a device to a Design Group?

A. Right-click the device and select Set Layer Membership

B. Right-click the device and select Set Design Group

C. Drag and drop the device into the Site

D. Drag and drop the device into the Design Group

Buy Now
Questions 5

A wiring closet with a POE+ switch is 250 feet (76 meters) away from an AP on a building floor. The AP's smart-rate port is connected to a smart-rate port on the switch, which is capable of 10 Gbps. The cable type is Cat5e STP.

What is the maximum speed that the customer can expect from the connected AP?

A. 2.5 Gbps

B. 1 Gbps

C. 5 Gbps

D. 10 Gbps

Buy Now
Questions 6

A network architect is creating a new wired design for a warehouse building. As a best practice, what length should the architect allow for the service loop in the wiring closets in this environment?

A. 3-10 feet (1-3 m)

B. 3 feet (1 m)

C. 15-30 feet (5-10 m)

D. 30-60 feet (10-20 m)

Buy Now
Questions 7

NewRocket requires a wireless capacity design 30 Aruba 510 APs will be connected to each wiring closet using SmartRate connections. Wireless coverage needs to be provided even if a POE+ switch loses power

Because of security concerns, wired video cameras were recently installed throughout the facility. There are 12 of these per floor. 6 per wiring closet. The cameras are 802.11n WiFi capable and have power injectors from which to draw

power.

Based on the POE+ needs of the mentioned devices, which solution would meet the POE+ requirements while still providing a redundant and cost-effective Wi-Fi solution for the devices that require POE+ for Building 1, Floor 2?

A. One 3810M 40G 8 HPE Smart Rate switch

B. Two 2930F 24-port POE+ switches

C. Two 2930M 24-port POE+ switches

D. One 2930M 48-port POE+ switch

Buy Now
Questions 8

When determining a customer's agenda and clarifying their expectations for a new HPE/Aruba deployment, which two questions should be asked during the stakeholder checklist? (Select two.)

A. What business problems are you trying to solve?

B. What is the networking experience of onsite personnel?

C. Which help desk system is deployed?

D. is a request for proposal or actual bill of materials (BOM) required?

E. What is your anticipated growth of the environment?

Buy Now
Questions 9

A network architect plans to use two ArubaOS 5406 switches in a wiring closet configured in a VSF domain The VSF link requires a 40 GDps connection. Which SFP+ transceiver solutions would meet this requirement?

A. QSFP+ LC

B. SFP

C. SmartRate

D. QSFP28

Buy Now
Questions 10

A network architect is redesigning the access layer in a data center for a customer. The access layer requires fixed-port switches that support VSF and data center features like L2 VXLAN and REST-API. Which switching solution should the network architect recommend?

A. 8400

B. 3810M

C. 2930F

D. 6300

Buy Now
Questions 11

A network architect needs to design a new wireless solution for a small company The architect estimates that about 150 APs will be required to implement a capacity design. Roaming support is required. Also, the design requires meshing to connect some of the APs to the network. The customer requires that client state synchronization be provided for real-time failover. Which solution would most cost-effectively meet these requirements?

A. lAPs in a cluster

B. FRAPs in a cluster

C. Two 7205 mobility controller and campus APs in a cluster

D. Two 7030 mobility controller and campus APs in a cluster

Buy Now
Questions 12

A network architect has developed a design for a new Aruba Wi-Fi network that will include a hardware Mobility Master (MM) running the ArubaOS 8 4 operating system that will manage:

Two clustered 7205 controllers with 300 campus APs Two clustered VMC-50 controllers with 75 remote APs

The architect plans on creating user roles, firewall policies, and wireless IPS policies on the controllers as well as implementing AirMatch.

What would meet the license requirements for this scenario?

A. LIC-MC-VA-50 (X2), LIC-AP (375), PEF (X375), RFP (X375)

B. LIC-MC-VA-50 (x1), LIC-AP (300), PEF (X300). RFP (x300)

C. LIC-MM-VA-50, LIC-MC-VA-50 (X1), LIC-AP (X300), PEF

D. LIC-MM-VA-500. LIC-MC-VA-50 (X2), LIC-AP

Buy Now
Questions 13

A network architect needs to plan a new wireless network:

A. Central only

B. Airwave and Central only

C. Airwave, Central, Windows, Mac OSX, and Linux

D. Airwave, Central, and Windows only

Buy Now
Exam Code: HPE6-A66
Exam Name: Aruba Certified Design Associate
Last Update: May 30, 2026
Questions: 60
10%OFF Coupon Code: SAVE10

PDF (Q&A)

$49.99

VCE

$55.99

PDF + VCE

$65.99