Questions 4

A customer has a Hadoop big data and analytics solution. The customer needs a server upgrade to improve performance for this solution and plans to add more solutions that draw on the data, such as a Cassandra NoSQL database. The customer is interested in a flexible HPE Big Data Reference Architecture approach.

Which solution meets the customer's needs?

A. HPE Moonshot 1500 Systems with m700 cartridges for co-located compute and storage nodes

B. HPE Apollo 4530 Systems for co-located compute and storage nodes

C. HPE Apollo 8000 Systems for the compute nodes and HPE Superdome X Systems for the storage nodes

D. HPE Moonshot 1500 Systems with m710 cartridges for the compute nodes and HPE Apollo 4200 Systems for the storage nodes

Buy Now
Questions 5

A customer recently purchased an HPE Moonshot chassis to host its internal website. Subsequently, the customer reports difficulties deploying new cartridges in an efficient manner. The customer suggests exchanging the solution for a more traditional server platform.

What can the architect demonstrate to the customer to help solve the problem while preserving the validity of the original design solution?

A. how to use SCCM to provide a graphical installation method for new nodes

B. how to use VSP to provide a graphical installation method for new nodes

C. how to add an mRCA module to provide a graphical installation method for new nodes

D. how to use iLO remote console to provide a graphical installation method for new nodes

Buy Now
Questions 6

An architect is planning an HPE Moonshot System solution to support a data analytics application. The application uses data mining. Which type of rack configuration should the architect recommend?

A. a configuration that balances the ratio of HPE Moonshot Systems to HPE Apollo 4200 servers, which store the data

B. a configuration that has a higher ratio of HPE Moonshot Systems to HPE Apollo 4200 servers, which store the data

C. a configuration that has a lower ratio of HPE Moonshot Systems to HPE Apollo 4200 servers, which store the data

D. a configuration in which the HPE Moonshot System hosts the analytics application and the data

Buy Now
Questions 7

A customer needs an HPE Apollo 6000 solution and Remote Direct Memory Access (RDMA). Which network interconnects should the architect recommend for this solution? (Choose two.)

A. 1 GbEthernet

B. Infiniband

C. FlexFabric

D. 16 Gb Fibre Channel

E. 12G SAS

Buy Now
Questions 8

A customer has 1,000 virtual machines that run on VMware ESXI servers. The customer is concerned that some of the virtual machines may be oversized, which could affect the other virtual machines. Which HPE product should the architect recommend to help the customer with infrastructure sizing, to improve efficiency, and to reduce cost?

A. HPE Operations Analytics for HPE OneView

B. HPE Insight Control

C. HPE Helion CloudSystem 9

D. HPE Cloud Optimizer for HPE OneView

Buy Now
Questions 9

An architect needs to demonstrate the financial advantages of a proposed HPE server and Hypervisor- based solution compared to a legacy server environment that has traditional servers and desktops.

Which tool should the architect use?

A. Hyperscale Business Value Calculator

B. Client Virtualization ROI Calculator

C. HPE Business Technology Optimization

D. HPE Business Process Monitor

Buy Now
Questions 10

A customer plans to migrate from two fully depreciated high end Relational Database Management System (RDMS) servers, which are out of warranty and still under a support contract. An architect has recommended the customer migrate to four new HPE Superdome X BL920 (2P/18C) blades running Microsoft SQL server.

Which cost statement provides a rationale for the migration?

A. Based on the TCO/ROI analysis for this project, the Apollo 4510 System makes a better choice as a SQL Database server platform for this migration

B. The amount of savings from not renewing the service contract on the existing equipment can pay for the new hardware in just a little over three years

C. The NPV of -$100,000 USD more than justifies the purchase price of the new equipment

D. The IRR for this proposal would have to be extended out for ten years to make sense, as the IRR value for the first three years is nearly 20 percent

Buy Now
Questions 11

An architect needs to scope the number of required m710p cartridges for video transcoding. The architect plans to aim for an additional 20 to 25 percent growth capacity.

In addition to this growth capacity, which factors will determine the number of required cartridges? (Choose two.)

A. the amount of memory required

B. the number of video streams required

C. the number of formats to which to convert

D. the number and type of processors

E. the amount of storage capacity required

Buy Now
Questions 12

An architect is planning an HPE Moonshot System deployment. The architect plans to individually connect each management module to the management network. The customer then informs the architect that this plan requires too many 1GbE ports per rack for the data center infrastructure.

What should the architect do to meet the customer's needs, while still allowing iLO access to the HPE Apollo Systems?

A. Have iLO traffic share the same ports as production traffic and inform the data center administrators that they should use VLANs to separate the two types of traffic.

B. Ensure that HPE Advanced Power Manager aggregates iLO acccess, as well as provides other rack and power management benefits.

C. Enable the iLO REST API on each HPE ProLiant XL server.

D. Add one Innovation Zone module on each chassis to connect to HPE Insight Cluster Management Utility (CMU).

Buy Now
Questions 13

A customer needs to use LACP to aggregate server network connections. The customer also needs to bond all FlexLOM connections in a single network across multiple switches.

Which networking feature should the architect recommend to meet the customer's needs?

A. Intelligent Resilient Framework

B. Transparent Interconnection of Lots of Links

C. Network Virtualization using Generic Routing Encapsulation

D. Shared Uplink Sets

Buy Now
Exam Code: HPE0-S22
Exam Name: Architecting Advanced HPE Server Solutions
Last Update: Apr 21, 2024
Questions: 96
10%OFF Coupon Code: SAVE10

PDF (Q&A)

$45.99

VCE

$49.99

PDF + VCE

$59.99