HP0-J67 Exam Questions & Answers

  Printable PDF

Download Demo

HP0-J67 Exam Questions & Answers

Vendor: HP

Certifications: HP ExpertONE Certification

Exam Code: HP0-J67

Exam Name: Architecting Multi-site HP Storage Solutions

Updated: Aug 11, 2022

Q&As: 121

Note: Product instant download. Please sign in and click My account to download your product.

PDF Only: $45.99 Software Only: $49.99 Software + PDF: $59.99

The HP0-J67 Questions & Answers covers all the knowledge points of the real exam. We update our product frequently so our customer can always have the latest version of the brain dumps. We provide our customers with the excellent 7x24 hours customer service. We have the most professional expert team to back up our grate quality products. If you still cannot make your decision on purchasing our product, please try our free demo.


Download Free HP HP0-J67 Demo

Experience Pass4itsure.com exam material in PDF version.
Simply submit your e-mail address below to get started with our PDF real exam demo of your HP HP0-J67 exam.

Instant download
Latest update demo according to real exam

*Email Address

* Our demo shows only a few questions from your selected exam for evaluating purposes

HP HP0-J67 Last Month Results

790
Successful Stories of HP HP0-J67 Exam
98.4%
High Score Rate in Actual HP Exams
92.1%
Same Questions from the Latest Real Exam

HP0-J67 Online Practice Questions and Answers

Questions 1

Refer to the scenario.

A large publicly-traded motion picture exhibitor that is a leader in digital and 3D cinema deployments operates 233 theaters and more than 2,200 screens in small to mid-sized communities in 35 states around the United States. They rely on

MS Exchange Server 2010 for email. MS SQL Server 2010 for analyzing data about movies and theater-goers, and MS Excel 2010 for crunching numbers.

The company runs nightly incremental backups and a full weekly backup that consists of close to 7 TB of data which takes up 72 hours to complete. The quarterly backups add an additional 7 TB of data. Tapes are inventoried and transported

from the main data center to the disaster recovery site 150 miles away. The process of transporting tape cartridges to and from the Disaster Recovery site requires hours of daily work.

The company currently relies on an aging robotic tape library and a process that takes the nightly backup tapes offsite every morning. Additionally, the company keeps an inventory, and if a restore is necessary they have to retrieve the tapes

from the DR site and transport them to the main data center site They have a 7 year data retention plan, and the tapes are expensive and not always reliable. Given the company's current system, if a full weekly backup fails over a weekend,

the re-run could take up to 10 hours, even if just one job failed.

The company has deployed a virtualized server infrastructure which runs VMware vSphere 5 on HP BladeSystem c7000 enclosures and BL460c servers interconnected with HP Virtual Connect Flex-10 10Gb Ethernet Modules as well as

several HP ProLiant DL380 servers. The company's top four IT improvements goals are as follows:

-replacing the aging robotic tape library

-enabling replication of backed up data from the main data center to the disaster recovery site (150 miles)

-retaining more backup data in smaller disk space

- increasing efficiency reliability, and ease of system administration Moreover the company's top three business benefit goals are as follows:

-increased confidence in disaster recovery

-minimal disruption by backups during regular business hours

-improved management of external audits

The company has asked that you create multiple solution proposals and prioritize one when you return for a presentation.

Based on the discussions with the client, you determine that the current DR strategy is not optimal. You want to propose a new layout that utilizes three data facilities, as shown in the exhibit.

How should you build the storage and backup based on this DR strategy?

A. Use an HP StoreOnce 4430 Backup solution to replicate the data between the three facilities. Use an additional HP StoreOnce 4430 array in the data bunker for long-term storage.

B. Use an HP StoreOnce 4430 Backup solution in each facility. Use an MSL library in the data bunker for archiving, and have a small MSL library in the other two sites for recovery.

C. Use data replication between the Main Data Center and the DR site. Use an HP StoreOnce 4430 Backup solution in the data bunker. Use an MSL library in the data bunker for archiving, and have a small MSL library in the other two sites for recovery

D. Use data replication between the three sites. Use an MSL library in the data bunker for archiving

Show Answer
Questions 2

Refer to the scenario.

A university provides liberal arts training to 2,500 students in 68 classrooms and provides a growing suite of IT services that encompass dorm rooms and classrooms. All 2,500 students are provisioned an HP EliteBook Tablet PC to access

these services. Students use these tablet PCs for taking notes, handling documents, communicating with each other and with instructors, and participating in distance-education classes.

Additionally, by using their tablet PCs as thin clients, science and engineering students leverage virtual desktop infrastructure (VDI) and HP Remote Graphics Software to access applications that run on high-powered HP blade servers. All 68

classrooms are multi-media equipped, enabling instructors to record lectures for the college s closed circuit TV system.

The university has implemented enterprise content management (ECM) applications, including Microsoft SharePoint for document imaging and workflow for staff and faculty, as well as for external accrediting bodies.

Additionally, a recent initiative to implement voice-over-IP telephone communications on campus has started.

The compute environment is based on VMware vSphere using HP BL460c and BL680c G7 server blades in c7000 enclosures within two data centers.

The university needs to develop computing solutions to address the following problems and current initiatives:

-The current backup-to-tape environment creates downtime for backups of 6 to 12 hours.

- Each incoming class of 600 floods the registration system within the first hours after it opens. The server and network gridlock caused by this high workload prolongs the registration process by as much as one hour per student.

-Proof of concept is necessary for distance education involving large volumes of video and major bandwidth requirements.

- Top tier data must be replicated between two data centers over a 10 Gbps network Disaster recovery has a recovery time objective (RTO) of 120 minutes and network utilization should be minimized.

-Seven TB of first tier data needs to be migrated from the current fibre channel storage solution to nearline storage.

- Second tier data requires deployment of a separate storage solution. The university's top four IT improvements goals are as follows:

-Provide a robust replication capability between data centers.

-Reduce server downtime with faster backups.

-Retain more backup data in smaller disk space.

- Increase efficiency, reliability, and ease of system administration. Moreover the college's top three business benefit goals are as follows:

-Reduce student registration time.

-Increase number of servers while minimizing the need for additional staff to support them.

-Utilize IT resources and staff as efficiently as possible.

The company has asked that you create multiple solution proposals and prioritize one when you return for a presentation.

What is required to license the top tier storage system in order to achieve the desired RTO?

A. HP 3PAR Adaptive Optimization

B. HP 3PAR Remote Copy

C. HP 3PAR Online Import

D. HP 3PAR Cluster Extension

Show Answer
Questions 3

Your customer has two data centers in a campus. The environment consists of: HP BladeSystem c7000 enclosures with HP Virtual Connect Flex-10 modules

HP ProLiant BL460c Server Blades

HP Storevirtual 4430

HP 5900 Switches

The HP Virtual Connect Flex-10 modules connect to the switches in three 10Gb Shared Uplink sets. The storage connects to the switches via 10Gb. The customer wants to migrate their network to a flat architecture and simplify managements.

What should you implement to meet the customer requirements?

A. HP Intelligent Resilient Framework (IRF)

B. HP Virtual Connect Enterprise Manager (VCEM)

C. Spanning Tree Protocol (STP)

D. HP Intelligent Management Center (IMO)

Show Answer More Questions

Why Choose Pass4itsure.com

  • Do you maintain 100% Guarantee on Pass4itsure.com products?

    Yes. Our PDF of HP0-J67 exam is designed to ensure everything which you need to pass your exam successfully. At Pass4itsure.com, we have a completely customer oriented policy. We invite the rich experience and expert knowledge of professionals from the IT certification industry to guarantee the PDF details precisely and logically. Our customers' time is a precious concern for us. This requires us to provide you the products that can be utilized most efficiently.

  • Do you offer free after-sale services?

    Yes. We provide 7/24 customer help and information on a wide range of issues. Our service is professional and confidential and your issues will be replied within 12 hous. Feel free to send us any questions and we always try our best to keeping our Customers Satisfied.

  • Do you provide free updates?

    Yes, once there are some changes on HP0-J67 exam, we will update the study materials timely to make sure that our customer can download the latest edition. The updates are provided free for 120 days.

  • What if I don't pass the exam? How do I claim Refund?

    Any Pass4itsure.com user who fails the corresponding exam has 30 days from the date of purchase of Exam on Pass4itsure.com for a full refund. We can accept and arrange a full refund requests only if your score report or any relevant filed be confirmed.

What Our Customers Are Saying:

Cadman

  • Greece

I'm feeling luck because there are no new questions! All the questions are form this dumps!!! Thanks for your help! Thank you all !!!


Lee

  • India

Thanks very much for the dumps. i will work it on to get the best in life. it is so great.


Lara

  • Greece

Dump is valid. Thanks for all.


Orlando

  • Bangladesh

Many questions are from the dumps but few question changed. Need to be attention.


Zack

  • Morocco

I pass today . In my opinion,this dumps is enough to pass exam. Good luck to you.


zorro

  • Egypt

Passed my exam today. Great job.Thanks this dumps.


Nike

  • United States

this dumps is really good and useful, i have passed the exam successfully. i will share with my friend


Jordan

  • Australia

The version is complete and accurate. The most important is that this dumps update quickly and there are many new questions . So I felt confident in exam. Recommend.


Marlin Erick

  • Kazakhstan

I studied this dumps, took some online trainings. At last I pass my exam today.


Quentin

  • United States

Very good dumps, take full use of it, you will pass the exam just like me.