Which of the following activities are performed during the requirements life cycle management phase?
A. Elicit Requirements
B. Prioritize Designs
C. Trace Requirements
D. Maintain Attributes
The requirements elicitation technique used to iteratively validate the needs of stakeholders that interact with the application is:
A. interface analysis
B. observation.
C. prototyping
D. reverse engineering.
What task is performed to ensure that all requirements align to the business need?
A. Model Requirements
B. Prioritize Requirements
C. Validate Requirements
D. Define Requirements
The likelihood that the requirement will change because it requires further analysis is termed as:
A. stability.
B. benefit.
C. dependency.
D. penalty.
Establishing the design option that is appropriate to meet the enterprise's requirements is the purpose of which task?
A. Define requirements architecture
B. Analyze potential value and recommend solution
C. Define design options
D. Specify and model requirements
Which technique represents a small, concise statement of functionality or quality needed to deliver value to a specific stakeholder?
A. User stories
B. Lessons learned
C. Business case
D. Scope modelling
Which type of requirements are temporary in nature?
A. Business requirements
B. Solution requirements
C. Stakeholder requirements
D. Transition requirements
What is the relationship between two requirements called when one requirement can be deduced from another at a higher level?
A. Satisfy
B. Necessity
C. Effort
D. Derive
What is the purpose of brainstorming?
A. To collaboratively choose a final design
B. To produce numerous new ideas
C. To receive feedback on a design or prototype
D. To improve stakeholder collaboration
When examining requirements relationships, the business analyst (BA) ensures the relationships satisfy the following quality criteria:
A. testable.
B. independent.
C. measurable.
D. unambiguous.