Pass4itsure > ISQI > ISQI Certifications > CTFL_UK > CTFL_UK Online Practice Questions and Answers

CTFL_UK Online Practice Questions and Answers

Questions 4

Since the system is in the medical domain and therefore in the safety critical area, testing needs to be A. High level of documentation

B. Failure Mode and Effect Analysis (FMEA) sessions

C. Traceability to requirements

D. Non-functional testing

E. Master test planning

F. Test design techniques

G. Reviews

Buy Now
Questions 5

Which of the following is a characteristic of good testing in any life cycle model? 1 credit

A. Analysis and design of tests begins as soon as development is completed.

B. Some, but not all, development activities have corresponding test activities.

C. Each test level has test objectives specific to that level.

D. All document reviews involve the development team.

Buy Now
Questions 6

A number of options have been suggested for the level of independence to be employed for the testing on the next project, and are shown below.

i. External test specialists perform non-functional testing.

ii. Testing is outsourced.

iii. Testing is carried out by the developer.

iv.

A separate test team carries out the testing.

v.

Testing is performed by the business.

vi.

Testing is performed by a different developer.

Which of the following orders the above in a correct order of independence? 1 credit

A.

i, ii, iv, vi

B.

ii, i, v, vi

C.

ii, v, i, iii

D.

i, iv, v, vi

Buy Now
Questions 7

You are considering involving users during test execution. In general, what is the main reason for involving users during test execution? 1 credit

A. They are a cheap resource

B. They have good testing skills

C. This can serve as a way to build their confidence in the system

D. They have the ability to also focus on invalid test cases

Buy Now
Questions 8

In addition to introducing the new team member, you have decided to raise motivation. Which of the measures listed below would be the best measure to take in order to increase the motivation of the team? 2 credits

A. Provide more time for testing in the schedule

B. Allow people to take some time off

C. Introduce entry criteria to the testing phase

D. Organize a meeting with senior management in which they address the importance of good testing for this project

Buy Now
Questions 9

Instead of having an independent test team within the company, the company is considering to outsource testing. What are THREE key challenges that are typical for outsourcing? 1 credit

A. Test environment more complex

B. Define expectation for tasks and deliverables

C. Clear channels of communications

D. Possibly different cultures

E. Testing of non-functional requirements

F. Audit trail from requirements to test cases

G. Applying test automation

Buy Now
Questions 10

In general, why is it NOT a good idea to estimate the testing effort based only on a percentage of development effort? Identify THREE valid reasons. 1 credit

A. The quality of the development estimate may be poor.

B. In general bottom-up estimation is always better than top-down estimation.

C. The percentage based technique only applies to the V life cycle model.

D. Using the same percentage every time does not address the level of risk of the application to be tested.

E. The maturity of the organization, e.g. the quality of the test basis, quality of development testing, configuration management, availability of test tools, also influence the effort needed for testing.

F. It builds on large set of historical data

G. The result is almost always a too low estimate for the required test effort

Buy Now
Questions 11

Comparing TMMi and TPI, which is not a valid reason for choosing either TPI or TMMi? 2 credits

A. If the scope of test performance improvement covers all test levels, TMMi is preferred since TPI focusses mainly on black-box testing.

B. If the organization is already applying CMMI, TMMi may be preferred since it has the same structure and uses the same terminology. TMMi addresses management commitment very strongly and is therefore more suitable to support a top-down improvement process.

C. TPI is much more a bottom-up model that is suitable for addressing test topics for a specific (test) project.

D. TMMi can only be used with the traditional V model,whereas TPI can be used with all types of software life cycles.

Buy Now
Questions 12

Which of the following phases in the fundamental test process is considered to deliver a document which can be used as a major input for test process improvement? 1 credit

A. Test planning and control

B. Test implementation and execution

C. Evaluating exit criteria and reporting

D. Test project closure

Buy Now
Questions 13

Which THREE activities would be valid steps during the development of the test strategy?2 credits (2 out of 3 correct 1 credit)

A. Identify test staff members that will be involved in the system test

B. Define test career paths

C. Understand the software development life cycle used by the software house

D. Assess the testing that needs to be done to minimize the risks

E. Issue the test strategy document for review

F. Define a master test plan template

G. Perform a project risk analysis

Buy Now
Exam Code: CTFL_UK
Exam Name: ISTQB Certified Tester Foundation Level
Last Update: May 05, 2024
Questions: 338
10%OFF Coupon Code: SAVE10

PDF (Q&A)

$45.99

VCE

$49.99

PDF + VCE

$59.99