A Non-parametric Test should be used if just one distribution is not Normal out of the two or more gathered.
A. True
B. False
A primary benefit of using a Multi-Vari Chart is it provides a visual presentation of two-way interactions.
A. True
B. False
What is the recommended tool when multiple improvements are being evaluated?
A. Control Plan
B. Implementation Plan
C. X-Y Matrix
D. FMEA
The area under the curve value is 1, then the mean, median and mode values would be same (True/ False).
A. True
B. False
All the steps given below are phases in DMAIC except:
A. Measure
B. Continue
C. Define
D. Analyze
In a process FMEA, one must first:
A. Reduce the probability of occurrence
B. Reduce the severity
C. Increase the probability of detection
D. All of the above
Six Sigma refers to a process whose output has at least 95% of its data points within 6 Standard Deviations from the Mean.
A. True
B. False
One of the 5S approaches to eliminating waste is to minimize work activities that are out of the ordinary thereby requiring unusual decisions and actions to accomplish the correct things. This 5S tool is called __________________.
A. Standardizing
B. Scheduling
C. Sustaining
D. Sorting
The Control Plan is created following the finalization of the Measure Phase and can be closed when?
A. After the project costs have been recouped
B. When the Champion says so
C. Never, a Control Plan must stay in place
D. At the fiscal yearend of the business
An important factor in a viable _________ is to determine who, when and to what level various personnel must be trained to maintain the improvements made to a process.
A. Control Plan
B. FMEA
C. Standard Operating Procedure
D. Process Map