Mode selection is one of the scheduling options available in Advanced Planning in SAP S/4HANA. When can you use mode selection?
A. When multiple operations are maintained for one product
B. When alternate resources are used within one operation
C. When multiple planned orders exist on one resource
D. When multiple production versions are maintained for one product
How can you carry out cost object controlling for production orders? (Choose 2)
A. Milestone-related
B. Cost-related
C. Product-related
D. Order-related
Which of the following processes lead to an entry in the MRP planing file? (Choose 3)
A. Change of the material's procurement type
B. Creation of purchasing contract
C. Creation of dependent requirements
D. Creation of sales order
E. Change of the storage bin
Which of the following elements does MRP take into account during net requirement calculation? (Choose 2)
A. Purchase orders
B. Lot size
C. Maximum stock level
D. Safety stock
Which options do you have to plan both quant ties and capacities during line loading in repetitive manufacturing? (Choose 2)
A. Run MRP with quota arrangement.
B. Run MRP with automatic selection of production version.
C. Assign planned orders manual lying the planning table.
D. Run PP/DS heuristics for repetitive manufacturing.
You use planning strategy Finite Scheduling - with Reverse adn want to allow scheduling in the past. How can you achive this?
A. Specify a negative offset time in the strategy profile.
B. Specify a positive planning horizon in the strategy profile.
C. Specify a negative lanning horizon in the strategy profile.
D. Specify a positive offset time in the strategy profile.
Which mhetods are available for goods issue posting of material components for process orders? (Choose 2)
A. Transfer order
B. Picking list
C. Blackflushing
D. Kanban
In the Schedule Production app which setting can you make for the planning strategy?
A. Fitness level
B. Scheduling control
C. Fixed pegging
D. Direction
E. Planning mode
Your project used process orders for the production of liquid chemicals.
What can you define to ensure that the production flow happens only in physically connected tanks?
A. Operation network
B. Work center hierarchy
C. Setup matrix
D. Resource network
For a production version to be valid and consistent what requirements must be fulfilled? (Choose 3)
A. The assigned routing and bill of materials (BOM) must be valid in the entire validity period.
B. The assigned routing must NOT have alternative sequences.
C. The deletion flag must NOT be set for the bill of materials (BOM) or the routing.
D. The lot size range must be within the lot-size range of the assigned routing.
E. The assigned routing must be a rate routing.