Pass4itsure > IBM > IBM Certified Specialist > C4070-604 > C4070-604 Online Practice Questions and Answers

C4070-604 Online Practice Questions and Answers

Questions 4

During which of the following activities do the customer and the technical specialist define post installation support?

A. During the TDA (Solution Assurance)

B. When establishing the system ship date

C. When configuring the System z using eConfig

D. During the installation of the equipment by the CE

Buy Now
Questions 5

z196 has better performance than z10 EC. Which of the following is the reason?

A. RAIM memory

B. Additional Cryptographic algorithm

C. More I/O bandwidth

D. Faster processor speed

Buy Now
Questions 6

What is the minimum acceptable process or technique to estimate the capacity requirement for a replacement CPC?

A. zCP3000

B. zTPM

C. LSPR capacity table

D. zPCR

Buy Now
Questions 7

A z114 will be defined as a member of an ensemble and use Unified Resource Manger. Which of the following options correctly describe the HMC requirements?

A. a Z114 requires no HMC

B. Requires a primary HMC only

C. Any HMC may be carried forward

D. Both the Primary HMC and Alternate HMC must have various identical components

Buy Now
Questions 8

A customer is planning a large consolidation project of multiple System z servers and numerous distributed servers. Which method is appropriate to perform a capacity planning and a TCO analysis for the consolidation?

A. RACEv tool to perform an in depth analysis of the environment

B. Rule of thumb (ten x86 processors = 1 IFL, 3 Power CPUs = 1IFL)

C. Scorpion study to perform an in depth analysis of the environment

D. Commercial benchmark results to estimate the hardware capacity and the BVAT for the TCO

Buy Now
Questions 9

A customer has a very large z196 Complex with 8 CEC in a Sysplex. The customer would like IBM to perform a study to help move to the latestA customer has a very large z196 Complex with 8 CEC? in a Sysplex. The customer would like IBM to perform a study to help move to the latest Infiniband 12X Links.

Which of the following is the correct tool to provide this?

A. BWA

B. CF Sizer

C. zTPM

D. zCP3000

Buy Now
Questions 10

The Solution edition for Data Warehousing includes which of the following components?

A. Foundational z/OS and DB2 for z/OS software to deploy a warehousing database on z/OS

B. DB2 for Linux on System z with partitioning feature

C. Information Management software and OPTIM Data Privacy Solution

D. A pre-defined hardware configuration of 2 general processors and 2 zIIPs with 16 GB of memory for LPAR definition

Buy Now
Questions 11

A customer is planning an upgrade to a z114. They have indicated that they will be adding additional disk storage in the future and want to make sure they have room for non disruptive future I/O growth. Which of the following is the appropriate first action for the Technical Specialist?

A. Use the eConfig Plan Ahead feature to place an order for an additional I/O drawer but don order any cards until they need them.

B. Ask the sales specialist to give the customer a discount and order the cards at the end of the quarter

C. Carefully plan out the upgrade based upon the current I/O configuration. Confirm there is enough room to support and add a future I/O drawer if needed.

D. The z114 hardware model M10 has more I/O adapters so you should order the M10 model which will assure you have room for future growth.

Buy Now
Questions 12

A customer expresses concern that one of their key ISV for z/OS is not willing to support their software on zEnterprise. A customer expresses concern that one of their key ISV? for z/OS is not willing to support their software on zEnterprise.

Which of the following is the first action for the IBM or Business Partner Technical Team to take?

A. Join a previously arranged customer meeting with the ISV to discuss

B. Retain the existing processor to run this ISV software

C. Notify the ISV their contract will be terminated and replaced with IBM software

D. Offer to share this concern with our PartnerWorld board for possible de-certification as an ISV.

Buy Now
Questions 13

A customer is considering a zEnterprise with a zBX. The customer has a back level AIX server installed running production workloads. Which of the following is the best action a specialist could take to ensure the customer is satisfied with the new zBX?

A. Migrate to the latest version of AIX for supported migration to the zEnterprise

B. Create a migration plan for all AIX applications to the zBX

C. Conduct a Fit for Purpose workshop to ensure the customer understands workload deployment on zEnterprise

D. Use zCP3000 to measure the transaction rate

Buy Now
Exam Code: C4070-604
Exam Name: IBM System z Technical V5
Last Update:
Questions: 57
10%OFF Coupon Code: SAVE10

PDF (Q&A)

$45.99

VCE

$49.99

PDF + VCE

$59.99