Pass4itsure > VMware > VMware Certifications > 3V0-624 > 3V0-624 Online Practice Questions and Answers

3V0-624 Online Practice Questions and Answers

Questions 4

You have been tasked with creating a vSphere 6.5 data center design for an organization. The organization has provided information via requirements gathering. Evaluate each statement and determine if the requirement is functional or nonfunctional.

Match Requirements on the left by dragging the red buttons (R1-R9) over the text of the appropriate Classification.

Select and Place:

Buy Now
Questions 5

In order to provide a critical service, a customer needs four virtual machines (VMs), each with 55GB memory reservation.

1.

This service must NOT experience an outage due to host hardware failures or host maintenance.

2.

The customer has ESXi hosts with 256GB of RAM each and, for business reasons, must run this service in a new ESXi host cluster.

Which VMware-recommended solution meets the stated requirements?

A. * Create an ESXi host cluster with 3 ESXi hosts.

* Enable HA and DRS on the ESXi host cluster.

B. * Create an ESXi host cluster with 2 ESXi hosts.

* Enable HA and DRS on the ESXi host cluster.

C. * Enable Fault Tolerance for the 4 VMs.

* Create an ESXi host cluster with 2 ESXi hosts.

D. * Enable HA and DRS on the ESXi host duster.

E. * Enable Fault Tolerance for the 4 VMs.

*

Create an ESXi host cluster with 3 ESXi hosts.

*

Enable HA and DRS on the ESXi host cluster.

Buy Now
Questions 6

A company wants to use All-Flash vSAN as storage for its virtual environment on six hosts. When creating the storage policies for the virtual machine, this company requirements are:

1.

The virtual machine data must be available in the event of 2-node failure.

2.

The virtual machine will use as little overhead as possible.

3.

The virtual machine will be allocating 50GB of 100GB, configured upon creation.

To meet these requirements, what does the storage policy look like?

A. Number of failures to tolerate = 1 Object space reservation = 50% Disable object checksum = No Failure tolerance method = RAID 5/6

B. Number of failures to tolerate = 2 Object space reservation = 50% Disable object checksum = Yes Failure tolerance method = RAID 5/6

C. Number of diskstripes per object = 2 Object space reservation = 10% Flash read cache reservation = 50% Failure tolerance method = RAID 5/6

D. Number of failures to tolerate = 2 Object space reservation = 10% Flash read cache reservation = 50% IOPS limit for object = 1000

Buy Now
Questions 7

A company is consolidating its IT operations efforts by moving the Finance, IT, and QA departments towards a self-service environment, following SDDC best practices.

1.

All departments have different priorities and expectations for uptime of the required infrastructure and applications.

2.

Project stakeholders are still discussing final approvals for the budget wan the CFO.

3.

To drive down the operating cost of the environment, only blade servers will implement this project.

4.

To ensure business continuity, a colocation provider was chosen to fail over virtual machines.

5.

The implementation of the project will follow a public reference architecture provided by VMware.

What is the assumption in this scenario?

A. The chosen architecture is sufficient.

B. All departments demand different SLAs.

C. Final budget approvals are being discussed.

D. The environment will be shared by several departments.

Buy Now
Questions 8

You are a platform designer constructing a physical design from an existing approved logicaldesign. Out of the vendor proposals, there are two proposed solutions that could be used. Which of the following options is the most important factor when making a decision?

A. Community and vendor-based best practices

B. Existing vendor relationships

C. Project requirements

D. Project budget

Buy Now
Questions 9

A system architect is building a design that includes three vCenter Server Appliances with 20 to 25 ESXi hosts each. The reliability of the environment is the top business priority because the company runs several applications that must be highly available.

Which VMware solution provides the ability to centrally detect issues in the environment and resolve them?

A. Set up a log collection and analysis engine such as VMware Log Insight and point all components of the vSphere environment to this engine.

B. Enable the deactivated VMware Log Browser Service to capture and search logs in the vSphere Web Client.

C. Use the new vSphere HTML5 client that provides multiple ways to detect and isolate issues in the environment.

D. Use the vCenter Server Support Assistant as an easy way to create log bundles, then transfer them to VMware support for analysis and resolution.

Buy Now
Questions 10

In the review of the current state of a business application, which three statements are true? (Choose three.)

A. A virtual machine can be scaled up more quickly than a bare metal server.

B. Application outages caused by known issues in the software do NOT count against the 99.9% SLA.

C. Average latency should be monitored to ensure that application transactions never exceed 5 milliseconds.

D. A weekly full backup and incremental every 2 hours meets an RPO of 2 hours.

E. Separation of duties can be implemented using Role Based Access Controls (RBAC).

Buy Now
Questions 11

A customer wants to upgrade the vSphere hosts in its development cluster to version 6.5.

1.

These hosts all utilize a vSphere 6.0 vSphere Distributed Switch (vDS)

2.

Due to hardware limitations, some of the hosts in the cluster must stay on version 6.0

Which procedure is supported while allowing the virtual machines to migrate between the two host versions?

A. Upgrade all the VMs to Virtual Machine Hardware v13

B. Upgrade to the Netwotk I/O control v3

C. Upgrade all the VMs to VMware Tools version 10.1

D. Upgrade the vSphere Distributed Swich to 6.5

Buy Now
Questions 12

A university is going through an IT transformation project and is re-evaluating how to use technology to provide a better academic experience for its 15,000 students. The university is a current VMware customer and has a single data center.

1.

Within that data center, the university is using blade servers backed by a Fibre Channel array for its business critical applications

2.

It has two iSCSI arrays (one for the development environment and other for the no-critical production environment)

3.

The university's VMware environment consists of three clusters. The first cluster contains all development virtual machines (VMs), the second cluster is dedicated to DMZ VMs, and the final cluster contains production VMs

4.

The university requires the ability to perform hardware maintenance without a service interruption, and can only sustain 4 minutes of downtime per month

From the list below, which three are constraints? (Choose three.)

A. 99.9% uptime is required for the environment

B. The Network Operation Center uses SolarWinds for all monitoring and alerting

C. Blade servers must be used to consolidate space

D. Provide capacity to support 20% Year-over-Year growth for the next 3 years

E. There area current contracts in place with Dell to provide all server hardware

Buy Now
Questions 13

A customer uses servers without internal storage and asks a systems architect to design a solution with a Fiber Channel array and blade servers as options. The customer requires:

1.

Easier server replacement

2.

Booting through HBA or FCoE

3.

Less wasted space

4.

Improved management

5.

Batter reliability

6.

Inexpensive servers

7.

Easier backup processes

Which design element will follow VMware recommended best practices and also meet customer requirements?

A. VMware Virtual SAN

B. Auto Deploy

C. PXE boot

D. Boot from SAN

Buy Now
Exam Code: 3V0-624
Exam Name: VMware Certified Advanced Professional 6.5 - Data Center Virtualization Design
Last Update: Dec 18, 2024
Questions: 142
10%OFF Coupon Code: SAVE10

PDF (Q&A)

$49.99

VCE

$55.99

PDF + VCE

$65.99