In a manufacturing plant, two purchase components P1 and P2 and a resource R1 are required to assemble a product. The cost of the assembly is calculated by using the standard costing method. The work definition and resource rates of the assembly have been defined as required. A cost accountant is estimating cost of the assembly, analyzing rolled-up costs before finally publishing estimates as frozen standards to cost accounting by using a cost planning scenario. While reviewing rolled up costs, the extended costs of purchase components are not included in a rolled-up scenario. Identify the reason.
A. Purchase components P1 and P2 are not associated with Material cost plan of the cost planning scenario.
B. Costs for purchase components P1 and P2 are not defined in cost accounting.
C. Create Accounting was not initiated.
D. Create Accounting Distributions was not initiated.
An employee is responsible for dealing with different manufacturing practices and processes, machines, tools and equipment that turn raw material into a product. Which seeded job role must this employee be provided with?
A. Manufacturing Engineer
B. Production Engineer
C. Production Operator
D. Manufacturing Supervisor
E. Production Supervisor
Your customer wants to mass create and modify Work Definitions and the relevant operation, items, and
resources available in the spreadsheet.
Which two operations are not supported using ADFDI (Oracle Application Development Framework
Desktop Integration)?
A. Create Work Definitions
B. Update Work Definitions
C. Create and update ATO (Assemble To Order) model work definitions
D. Populate Descriptive flexfields
Your customer is a light assembly manufacturing company that doesn't require shop floor control. A manufacturing engineer wants to generate a work definition automatically for some items, and wants to eliminate the explicit maintenance of work definitions. Which three steps must be completed and verified in the Work Definition area?
A. Ensure the predefined work definition name ORA_MAIN name is active.
B. Select a resource that is to be used in automatic work definition by enabling the attribute Default for automatic work definition.
C. Select a standard operation that is to be used in automatic work definition by enabling the attribute Default for automatic work definition.
D. Ensure the item is a standard item with a secondary item structure.
E. Ensure there is only one default standard operation at a given point in time.
A user wants to transfer the work order status updates and resource transaction data for costed resources
to Cost Management.
Which scheduled process should you run to achieve this requirement?
A. Transfer Cost to Cost Management
B. Transfer Transactions to Costing
C. Transfer Ledger Balances
D. Transfer General Ledger Balances to Balance Cubes
A Manufacturing Engineer in a plant is creating an alternative manufacturing process for an item using its existing Work Definitions. After copying from the existing Work Definition WD1 to the alternative Work Definition WD2, the engineer finds that the operation items were not copied in the alternative manufacturing process WD2. Identify the reason.
A. The Production Priority was not populated in the new Work Definition WD2 during creation.
B. The Item and Structure Name in the existing Work Definition WD1 were retained in the new Work Definition WD2 as well during creation.
C. The Item and Structure Name were changed in the new Work Definition WD2 during creation.
D. The Start Data was not populated in the new Work Definition WD2 during creation.
The Plant Manager informs you that they have bought several machines for their manufacturing plant ABC. The plant has been set up with a separate cost element set ABC in Manufacturing Cloud. You are requested to configure these machines in such a way that those are costed to the work order for which operations are performed on these machines. Identify the correct setup that you will advise to the Plant Manager.
A. Set up the machines as cost element type of "Resource" by selecting Cost Element set ABC.
B. Set up the machines as cost element type of "Overhead" by selecting Cost Element set ABC.
C. Set up the machines as cost element type of "Overhead" by selecting Cost Element set Common.
D. Set up the machines as cost element type of "Resource" by selecting Cost Element set Common.
Identify three requirements fulfilled by nonstandard work orders.
A. Rescheduling
B. Repair
C. Rework
D. Prototype
The production user wants to report Work Order completion. Identify two ways of reporting the progress of work order at work order operation level.
A. Change Move status to Ready.
B. Complete using quantity completion
C. Complete with Details
D. Quick Complete
E. Change status of Operation to completed
A Production operator in your company is required to report production activities, such as completing or
scrapping production units, by referencing a work definition without creating work orders.
Identify the manufacturing transaction that a production operator can perform for reporting such activities.
A. Orderless Transactions
B. Operation Transactions
C. Resource Transactions
D. Movement request
E. Material Transactions